| |
|
 |
.→ MV
Switchgears .→
Introduced ring-like network power supplying concept to China;
.→ Promoted
urban power transmission and distribution process;
.→
Free of maintenance and long-life. |
 |
.→
DDSYF998 Single-phase,Time-share,
Electronic Energy Meters
.→
IC card pre-payment and emergently overdraft;
.→
Single phase AC active energy time-sharing calculation ;
>
.→
Maximum load control and residual electricity alarming ;
.→
Different price in calculation different periods of time.
|
 |
.→
DSSY998,DTSY998
Pre-paid Electronic Energy Meters
.→
Record three-phase active energfy,IC pre-paid;
.→
Record max load, alarm or switch off over credit load;
.→
High ability in anti-tampering;
.→
Set meter through data collector and display several kinds
of data available. |
 |
.→
Meter SCADA systems
.→
Data acquire and parameter set locally remotely; .→
Communicate locally or remotely; .→
Compatible with gas and water meters. |
 |
.→
Power Supplying
Lines inspection& management Systems
.→
Record with digial cameras on site;
.→
Ensure true line checking;
.→
Data input to palm computers and transmitted;
.→
Timely settle problems according to
orders;
.→
High efficiency, high accuracy, and
timely |
 |
.→
Valves Actiation
0.1s
.→
Activation time:0.1s
.→
Torque:20Kg.m
.→
Equipped with DN50-DN150 ballvales and
butterfly valves |
|
|